No. 66/2012/QD-UBND |
Ho Chi Minh city, December 28, 2012 |
PEOPLE’S COMMITTEE OF HO CHI MINH CITY
Pursuant to the Law on Organization of People’s Councils and People’s Committees dated November 26, 2003;
Pursuant to the Government’s Decree No. 197/2004/ND-CP dated December 3, 2004 on compensation, support and resettlement upon the State’s land expropriation;
Pursuant to the Government’s Decree No.69/2009/ND-CP dated August 13, 2009 on supplementation of land-use planning, land prices, land expropriation, compensation, support and resettlement;
Pursuant to the Government’s Decree No. 45/2011/ND-CP dated June 17, 2011 on registration fee;
Pursuant to the Circular No. 124/2011/TT-BTC dated August 31, 2011 of the Ministry of Finance on instructions about the registration fee;
Pursuant to the Decision No. 69/2005/QD-UB dated May 5, 2005 of People’s Committee of the city on promulgation of regulations on assignment of tasks of and delegation of authority over the state management of prices in Ho Chi Minh city;
Upon the request of the Department of Construction made in the Statement No. 9642/TTr-SXD-QLKTXD dated December 10, 2012 for issuing of the standardized schedule of investment unit costs of construction works within Ho Chi Minh city; opinions of the Department of Justice given in the Official Dispatch No. 4741/STP-VB dated November 27, 2012,
HEREBY DECIDES
Article 1. The standardized schedule of investment unit costs of construction works which is used for the following purposes:
1. Calculating the registration fee;
2. Compensating for damage or losses of houses, facilities and architectural objects upon the State’s land expropriation;
3. Fixing the prices of houses, facilities and architectural objects which is used in the process of sale and disposition of premises under the State ownership;
4. Carrying out the equitization of state enterprises;
5. Supporting the judicial processes and enforcement of court judgements.
Article 2. Transition of the standardized schedule of investment unit costs of construction works hereto attached shall be subject to the following provisions:
1. If houses, facilities and architectural objects of which prices have already been fixed according to the standardized schedule issued in the Decision No. 12/2008/QD-UBND dated February 20, 2008 of the People’s Committee of the city, issuing the standardized schedule of investment unit costs of construction works within the city; the Decision No. 64/2008/QD-UBND dated July 31, 2008 of the People’s Committee of the city on adjustments and supplements to certain contents of the Decision No. 12/2008/QD-UBND dated February 20, 2008 of the People’s Committee of the city, issuing the standardized schedule of investment unit costs of construction works within the city; the Decision No. 92/2008/QD-UBND dated December 26, 2008 of the People’s Committee of the city, issuing the indexing factors for application of the Decision No. 12/2008/QD-UBND dated February 20, 2008 and the Decision No. 64/2008/QD-UBND dated July 31, 2008 of the People’s Committee of the city, are used for purposes specified in Article 1 (except the purpose of pricing intended for compensation and support for losses or damage upon the State's land expropriation) before the entry into force of this Decision, adjustments shall not be made or adjustments shall be made according to the schedule referred to herein.
2. As for projects in which compensation, support for losses and damage and resettlement have been completed and those in which compensation and support for losses and damage are in progress, the compensation plan already approved shall be continued, and application of the Schedule issued herein or adjustments made according to that Schedule shall not be allowed.
3. As for projects in which the plan for compensation, support for losses and damage and resettlement has already been approved, if compensation and support payments for losses and damage have not yet been made until the entry into force of this Decision, the Schedule issued herein shall be applied.
Article 3. Pursuant to regulation of the Central Government on unit costs of construction works at urban areas and variations in market prices, the Department of Construction shall be authorized to preside over collaboration with related entities in studying the establishment, modification and supplementation of the standardized Schedule; send a report to the Department of Finance that will then carry out assessment of such report before submitting an assessment report to the People’s Committee of the city to seek its approval for supplements and amendments to the Schedule to adapt to the reality.
The Department of Construction shall be authorized to provide instructions on specific cases which have not yet been mentioned in the standardized Schedule hereto attached.
Article 4. This Decision will enter into force in 10 days after the signature date. This Decision shall replace the Decision No. 12/2008/QD-UBND dated February 20, 2008 of the People’s Committee of the city, issuing the standardized schedule of investment unit costs of construction works within the city; the Decision No. 64/2008/QD-UBND dated July 31, 2008 of the People’s Committee of the city on adjustments and supplements to certain contents of the Decision No. 12/2008/QD-UBND dated February 20, 2008 of the People’s Committee of the city, issuing the standardized schedule of investment unit costs of construction works within the city; the Decision No. 92/2008/QD-UBND dated December 26, 2008 of the People’s Committee of the city, issuing the indexing factors for application of the Decision No. 12/2008/QD-UBND dated February 20, 2008 and the Decision No. 64/2008/QD-UBND dated July 31, 2008 of the People’s Committee of the city. Previous regulations in contrast to this Decision shall be repealed.
Article 5. The Chief of the Office of the city’s People’s Committee, Directors of the city’s Departments, Chairs of People’s Committees of urban/rural districts, wards/communes, towns, and Heads of entities, units, organizations, family households and individuals concerned, shall be responsible for implementing this Decision./.
|
|
FOR PEOPLE’S
COMMITTEE |
STANDARDIZED SCHEDULE OF INVESTMENT UNIT COSTS – CONSTRUCTION COMPONENTS
(Annexed to the Decision No. 66/2012/QD-UBND dated December 28, 2012 of the People’s Committee of Ho Chi Minh city)
|
No. |
Type of construction work |
Unit |
Investment unit cost |
||
|
Pile foundations L ≤ 15m |
Pile foundations L > 15m |
||||
|
1 |
2 |
3 |
4 |
5 |
|
|
A |
Residential homes |
||||
|
1 |
Single-story villas |
1. Framing structure (bases, columns, beams), reinforced concrete roof (with or without tiles); brick masonry walls coated with water-based paint; floor paved with rectified glazed tiles (size: 80x80 or equivalent); granite façade. |
VND/m2 |
6,070,000 |
6,400,000 |
|
2. Reinforced concrete framing structure; tiled roof; plaster ceiling panel; brick masonry walls coated with water-based paint; floor paved with rectified glazed tiles (size: 80x80 or similar); granite façade. |
VND/m2 |
5,720,000 |
6,200,000 |
||
|
3. Reinforced concrete framing structure; tiled roof; brick masonry walls coated with water-based paint; floor paved with rectified glazed tiles (size: 80x80 or similar); granite façade. |
VND/m2 |
5,370,000 |
5,650,000 |
||
|
2 |
Multiple-story villas |
1. Reinforced concrete framing structure, floors, roof (with or without tiles); brick masonry walls coated with water-based paint; groundfloor paved with rectified glazed tiles (size: 80x80 or similar); granite façade. |
VND/m2 |
5,635,000 |
5,930,000 |
|
2. Reinforced concrete framing structure, floors; tiled roof; plaster ceiling panels; brick masonry walls coated with water-based paint; groundfloor paved with rectified glazed tiles (size: 80x80 or similar); granite façade. |
VND/m2 |
5,285,000 |
5,560,000 |
||
|
3. Reinforced concrete framing structure, floor; corrugated metal roof; plaster ceiling panels; brick masonry walls coated with water-based paint; groundfloor paved with rectified glazed tiles (size: 80x80 or similar); granite façade. |
VND/m2 |
4,935,000 |
5,200,000 |
||
|
4. Reinforce concrete or brick masonry pillars; floors loading on class-I metal arch lintels; tiled or corrugated steel roof with ceiling panel; brick masonry walls; ceramic or similar tile groundfloor |
VND/m2 |
3,500,000 |
|
||
|
5. Brick or wood pillars, plank floors; tiled or corrugated steel roof with ceiling panel; brick masonry walls; ceramic or similar tile groundfloor. |
VND/m2 |
3,050,000 |
|
||
|
3 |
Single-story townhouses |
1. Reinforced concrete framing structure and roof; brick walls coated with water-based paint; ceramic or similar tile floor. |
VND/m2 |
4,150,000 |
|
|
2. Reinforced concrete framing structure; tiled roof; plaster ceiling panel; brick masonry walls coated with water-based paint; ceramic or similar tile floor. |
VND/m2 |
3.540.000 |
|
||
|
3. Reinforced concrete framing structure; tiled roof; plaster ceiling panel; brick masonry walls coated with water-based paint; ceramic or similar tile floor. |
VND/m2 |
3,160,000 |
|
||
|
4. Brick or wood pillars; corrugated steel or tiled roof; brick + wood or metal sheet walls; patterned or similar tile floor. |
VND/m2 |
2,620,000 |
|
||
|
5. Brick or wood pillars; asphalt paper or leaf roof; brick + wood or metal sheet walls; patterned or similar tile floor. |
VND/m2 |
1,945,000 |
|
||
|
6. Wood pillars; corrugated steel roof, plywood or fiberboard ceiling panel; wooden plank or corrugated metal sheet partitions; flat cement concrete floor. |
VND/m2 |
1,350,000 |
|
||
|
7. Wood pillars; leaf or asphalt paper roof; corrugated metal sheet + plank sheet partitions; flat cement concrete floor |
VND/m2 |
940,000 |
|
||
|
4 |
Townhouses with 4 storeys or less |
1. Reinforced concrete framing structure, floors and roof; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,050,000 |
4,260,000 |
|
2. Reinforced concrete framing structure, floors; tiled roof; plaster ceiling panels; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
3,900,000 |
4,100,000 |
||
|
3. Reinforced concrete framing structure, floors; tiled roof; plaster ceiling panels; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
3,750,000 |
3,950,000 |
||
|
4. Reinforced concrete or brick masonry pillars, roofing floors loading on class-I metal arch lintels; ceramic or similar tile groundfloor. |
VND/m2 |
3,050,000 |
3,210,000 |
||
|
5. Reinforced concrete or brick masonry pillars, floors loading onto class-I metal arch lintels; ceramic or similar tile groundfloor. |
VND/m2 |
2,950,000 |
3,100,000 |
||
|
6. Reinforced concrete or brick masonry pillars; false or wooden plank floors; tiled or corrugated steel roof with ceiling panel; brick masonry walls; ceramic or similar tile groundfloor. |
VND/m2 |
2,900,000 |
|
||
|
7. Wood pillars; wood floors; corrugated steel roof with ceiling panel; wooden partitions; ceramic or similar tile groundfloor. |
VND/m2 |
1,670,000 |
|
||
|
5 |
Townhouses with 5 storeys or more |
1. Reinforced concrete framing structure, floors and roof (with or without tiles); brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,500,000 |
4,740,000 |
|
2. Reinforced concrete framing structure, floors; tiled roof; plaster ceiling panels; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,400,000 |
4,630,000 |
||
|
3. Reinforced concrete framing structure, floors; tiled roof; plaster ceiling panels; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,300,000 |
4,530,000 |
||
|
6 |
Apartment buildings with 5 storeys or less |
1. Reinforced concrete framing structure, floors and roof; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,740,000 |
4,990,000 |
|
2. Reinforced concrete framing structure, floors; tiled or corrugated steel roof; plaster ceiling panels; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,390,000 |
4,620,000 |
||
|
7 |
Apartment buildings with 6-8 storeys |
1. No basement |
VND/m2 |
4,980,000 |
5,240,000 |
|
2. With 1 basement |
VND/m2 |
5,730,000 |
6,030,000 |
||
|
8 |
Apartment buildings with 9-14 storeys |
1. No basement |
VND/m2 |
5,230,000 |
5,500,000 |
|
2. With 1 basement |
VND/m2 |
6,010,000 |
6,330,000 |
||
|
3. With 2 or more basements |
VND/m2 |
6,270,000 |
6,600,000 |
||
|
9 |
Apartment building with 15-20 storeys |
1. No basement |
VND/m2 |
5,490,000 |
5,780,000 |
|
2. With 1 basement |
VND/m2 |
6,310,000 |
6,640,000 |
||
|
3. With 2 or more basements |
VND/m2 |
6,590,000 |
6,930,000 |
||
|
10 |
Apartment buildings with 21-25 storeys |
1. No basement |
VND/m2 |
5,760,000 |
6,070,000 |
|
2. With 1 basement |
VND/m2 |
6,630,000 |
6,980,000 |
||
|
3. With 2 or more basements |
VND/m2 |
6,920,000 |
7,280,000 |
||
|
11 |
Apartment buildings with more than 25 storeys |
1. No basement |
VND/m2 |
5,880,000 |
6,190,000 |
|
2. With 1 basement |
VND/m2 |
6,760,000 |
7,120,000 |
||
|
3. With 2 or more basements |
VND/m2 |
7,050,000 |
7,430,000 |
||
|
B |
Work homes, office buildings, commercial centers |
||||
|
12 |
Homes with 5 storeys or less |
- Common. |
VND/m2 |
4,250,000 |
4,480,000 |
|
- Specially decorated (with ceramic or rectified glazed tile groundfloor, size of 80 x 80 or greater; decorative glass covering at least 70% of façade measurement). |
VND/m2 |
4,650,000 |
4,890,000 |
||
|
13 |
Homes with 6-8 storeys |
1. No basement |
|
||
|
- Common. |
VND/m2 |
4,460,000 |
4,700,000 |
||
|
- Specially decorated. |
VND/m2 |
4,880,000 |
5,140,000 |
||
|
2. With 1 basement |
|
||||
|
- Common. |
VND/m2 |
5,140,000 |
5,400,000 |
||
|
- Specially decorated. |
VND/m2 |
5,610,000 |
5,910,000 |
||
|
14 |
Homes with 9-14 storeys |
1. No basement |
|
||
|
- Common. |
VND/m2 |
4,550,000 |
4,800,000 |
||
|
- Specially decorated. |
VND/m2 |
4,980,000 |
5,240,000 |
||
|
2. With 1 basement |
|
||||
|
- Common. |
VND/m2 |
5,240,000 |
5,510,000 |
||
|
- Specially decorated. |
VND/m2 |
5,720,000 |
6,020,000 |
||
|
3. With 2 or more basements |
|
||||
|
- Common. |
VND/m2 |
5,460,000 |
5,750,000 |
||
|
- Specially decorated. |
VND/m2 |
5,970,000 |
6,290,000 |
||
|
15 |
Homes with 15-20 storeys |
1. No basement |
|
||
|
- Common. |
VND/m2 |
4,650,000 |
4,890,000 |
||
|
- Specially decorated. |
VND/m2 |
5,080,000 |
5,340,000 |
||
|
2. With 1 basement |
|
||||
|
- Common. |
VND/m2 |
5,340,000 |
5,620,000 |
||
|
- Specially decorated. |
VND/m2 |
5,840,000 |
6,150,000 |
||
|
3. With 2 or more basements |
|
||||
|
- Common. |
VND/m2 |
5,570,000 |
5,870,000 |
||
|
- Specially decorated. |
VND/m2 |
6,090,000 |
6,410,000 |
||
|
16 |
Homes with 21-25 storeys |
1. No basement |
|
||
|
- Common. |
VND/m2 |
4,740,000 |
4,990,000 |
||
|
- Specially decorated. |
VND/m2 |
5,180,000 |
5,450,000 |
||
|
2. With 1 basement |
|
||||
|
- Common. |
VND/m2 |
5,450,000 |
5,740,000 |
||
|
- Specially decorated. |
VND/m2 |
5,950,000 |
6,270,000 |
||
|
3. With 2 or more basements |
|
||||
|
- Common. |
VND/m2 |
5,690,000 |
5,990,000 |
||
|
- Specially decorated. |
VND/m2 |
6,210,000 |
6,540,000 |
||
|
17 |
Homes with more than 25 storeys |
1. No basement |
|
||
|
- Common. |
VND/m2 |
4,830,000 |
5,090,000 |
||
|
- Specially decorated. |
VND/m2 |
5,280,000 |
5,560,000 |
||
|
2. With 1 basement |
|
||||
|
- Common. |
VND/m2 |
5,560,000 |
5,850,000 |
||
|
- Specially decorated. |
VND/m2 |
6,070,000 |
6,390,000 |
||
|
3. With 2 or more basements |
|
||||
|
- Common. |
VND/m2 |
5,800,000 |
6,110,000 |
||
|
- Specially decorated. |
VND/m2 |
6,340,000 |
6,670,000 |
||
|
C |
Hotels (irrespective of number of storeys) |
||||
|
18 |
1-star hotels |
1. No basement |
VND/m2 |
4,590,000 |
4,830,000 |
|
2. With 1 basement |
VND/m2 |
5,280,000 |
5,550,000 |
||
|
19 |
2-star hotels |
1. No basement |
VND/m2 |
5,180,000 |
5,450,000 |
|
2. With 1 basement |
VND/m2 |
5,960,000 |
6,270,000 |
||
|
20 |
3-star hotels |
1. No basement |
VND/m2 |
5,440,000 |
5,730,000 |
|
2. With 1 basement |
VND/m2 |
6,260,000 |
6,580,000 |
||
|
21 |
4-star hotels |
1. No basement |
VND/m2 |
6,000,000 |
6.310.000 |
|
2. With 1 basement |
VND/m2 |
6,900,000 |
7,260,000 |
||
|
3. With 2 or more basements |
VND/m2 |
7,200,000 |
7,560,000 |
||
|
22 |
5-star hotels |
1. No basement |
VND/m2 |
6,420,000 |
6,760,000 |
|
2. With 1 basement |
VND/m2 |
7,390,000 |
7,770,000 |
||
|
3. With 2 or more basements |
VND/m2 |
7,710,000 |
8,110,000 |
||
|
D |
Cultural and educational construction projects |
||||
|
23 |
Cinemas, theaters, convention halls (with interior designs the same as theaters) |
1. 200 – 400 seats. |
|
||
|
- No basement |
VND/m2 |
4,010,000 |
4,220,000 |
||
|
- With 1 basement |
VND/m2 |
4,610,000 |
4,850,000 |
||
|
2. Greater than 400 – 600 seats. |
|
||||
|
- No basement |
VND/m2 |
4,270,000 |
4,500,000 |
||
|
- With 1 basement |
VND/m2 |
4,910,000 |
5,170,000 |
||
|
3. Greater than 600 – 800 seats. |
|
||||
|
- No basement |
VND/m2 |
4,630,000 |
4,870,000 |
||
|
- With 1 basement |
VND/m2 |
5,320,000 |
5,600,000 |
||
|
4. Greater than 800 – 10,000 seats. |
|
||||
|
- No basement |
VND/m2 |
5,140,000 |
5,410,000 |
||
|
- With 1 basement |
VND/m2 |
5,910,000 |
6,220,000 |
||
|
24 |
Schools (intended for all educational levels, less than 5 storeys) |
1. Reinforced concrete framing structure, floors and roof; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
5,260,000 |
5,540,000 |
|
2. Reinforced concrete framing structure, floors; tiled or corrugated steel roof with ceiling panel; brick masonry walls coated with water-based paint; ceramic or similar tile groundfloor. |
VND/m2 |
4,910,000 |
5,190,000 |
||
|
DD |
Manufacturing plants |
||||
|
25 |
Width <18m, height <6m, and no bridge cranes |
1. Reinforced concrete foundation, steel pillars, steel rafters and beams; corrugated steel or fibro roof; brick masonry walls |
VND/m2 |
2,400,000 |
|
|
2. Reinforced concrete foundation, pillars, reinforced concrete rafters; steel beams; corrugated steel or fibro roof; brick masonry walls. |
VND/m2 |
2,400,000 |
|
||
|
3. Reinforced concrete foundation, pillars, steel rafters and beams; corrugated steel or fibro roof; brick masonry walls. |
VND/m2 |
2,400,000 |
|
||
|
4. Reinforced concrete foundation, steel pillars, wooden rafters and beams; corrugated steel or fibro roof; corrugated steel partition walls. |
VND/m2 |
2,200,000 |
|
||
|
26 |
Width 18m-30m, height 6m-9m, and no bridge cranes |
1. Reinforced concrete foundation, steel pillars, steel rafters and beams; corrugated steel or fibro roof; brick masonry walls. |
VND/m2 |
2,800,000 |
|
|
2. Reinforced concrete foundation, pillars, reinforced concrete rafters; steel beams; corrugated steel or fibro roof; brick masonry walls. |
VND/m2 |
2,800,000 |
|
||
|
3. Reinforced concrete foundation, pillars, steel rafters and beams; corrugated steel or fibro roof; brick masonry walls. |
VND/m2 |
2,800,000 |
|
||
|
4. Reinforced concrete foundation, steel pillars, wooden rafters and beams; corrugated steel or fibro roof; corrugated steel partition walls. |
VND/m2 |
2,600,000 |
|
||
|
E |
Gas filling stations |
||||
|
27 |
Steel storage tanks and piping systems |
1. Without protective coatings |
VND/m3 |
6,850,000 |
|
|
2. With protective coatings |
VND/m3 |
8,270,000 |
|
||
|
28 |
Control rooms connected to gas filling stations |
1. Reinforced concrete framing structure and roof; brick walls coated with water-based paint; ceramic or similar tile floor. |
VND/m2 |
4,530,000 |
|
|
2. Reinforced concrete framing structure; corrugated steel roof with ceiling panel; brick masonry walls coated with water-based paint; ceramic or similar tile floor. |
VND/m2 |
4,030,000 |
|
||
|
29 |
Filling station rooftops |
1. Reinforced concrete foundation, pillars, steel rafters; corrugated steel roof. |
VND/m2 |
600,000 |
|
|
2. Reinforced concrete foundation, steel pillars, steel rafters; corrugated steel roof. |
VND/m2 |
600,000 |
|
||
|
G |
Technical infrastructure |
||||
|
30 |
Internal roads and storage yards |
1. Hot mix asphalt concrete pavement |
VND/m2 |
640,000 |
|
|
2. Cold mix asphalt concrete pavement |
VND/m2 |
513,000 |
|
||
|
3. 1x2 rock or gravel concrete pavement |
VND/m2 |
335,000 |
|
||
|
4. Soil-aggregate mix road |
VND/m2 |
156,000 |
|
||
|
5. Red aggregate chipping road |
VND/m2 |
134,000 |
|
||
|
6. Yard, sidewalk paved with worm-shaped bricks or cement bricks |
VND/m2 |
265,000 |
|
||
|
7. Clay tile yard. |
VND/m2 |
143,000 |
|
||
|
8. Concrete slab yard. |
VND/m2 |
136,000 |
|
||
|
9. Cement and mortar mix yard, 3cm in thickness |
VND/m2 |
112,000 |
|
||
|
31 |
Fountains |
1. Reinforced concrete fountain ≤100 m3 and >15m in height. |
VND/m3 |
13,580,000 |
|
|
2. Reinforced concrete fountain ≤100 m3, and 10m - ≤15m in height. |
VND/m3 |
10,870,000 |
|
||
|
3. Reinforced concrete fountain ≤100 m3, and 5m - <10m in height. |
VND/m3 |
8,150,000 |
|
||
|
4. Reinforced concrete fountain ≤100 m3, and <5m in height. |
VND/m3 |
6,110,000 |
|
||
|
5. Reinforced concrete fountain >100 m3, and >15m in height. |
VND/m3 |
16,660,000 |
|
||
|
6. Reinforced concrete fountain >100 m3, and 10m - ≤15m in height. |
VND/m3 |
14,490,000 |
|
||
|
7. Reinforced concrete fountain >100 m3, and 5m - <10m in height. |
VND/m3 |
12,600,000 |
|
||
|
8. Reinforced concrete fountain >100 m3, and <5m in height. |
VND/m3 |
10,960,000 |
|
||
|
32 |
Underground water pools and septic tanks |
Brick masonry walls, reinforced concrete cover |
|
||
|
1. Capacity ≤ 50m3 |
VND/m3 |
2,410,000 |
|
||
|
2. Capacity > 50m3 |
VND/m3 |
2,820,000 |
|
||
|
Reinforced concrete walls and cover: |
|
||||
|
1. Capacity ≤ 50m3 |
VND/m3 |
5,130,000 |
|
||
|
2. Capacity > 50m3 - 100m3 |
VND/m3 |
5,840,000 |
|
||
|
3. Capacity > 100m3 |
VND/m3 |
6,740,000 |
|
||
|
33 |
Rooftop pools |
Brick masonry walls, reinforced concrete cover: |
|
||
|
1. Capacity ≤ 50 m3 |
VND/m3 |
2,540,000 |
|
||
|
Reinforced concrete walls and cover: |
|
||||
|
1. Capacity ≤ 50m3 |
VND/m3 |
5,390,000 |
|
||
|
2. Capacity >50 m3 – 100 m3 |
VND/m3 |
6,130,000 |
|
||
|
3. Capacity >100 m3 |
VND/m3 |
7,080,000 |
|
||
|
34 |
Technical infrastructure of urban zones |
1. ≤ 20ha |
million dong/ha |
5,900 |
|
|
2. 20 - 50ha |
million dong/ha |
5,700 |
|
||
|
3. > 50ha |
million dong/ha |
5,300 |
|
||
|
H |
Several premises and architectural structures |
||||
|
35 |
Guard rooms (separate unit) |
1. Reinforced concrete framing, reinforced concrete roof with or without tiles, brick masonry walls coated with water-based paint, ceramic tile floor. |
VND/m2 |
4,450,000 |
|
|
2. Reinforced concrete framing, tiled or corrugated steel roof, brick masonry walls coated with water-based paint, ceramic tile floor. |
VND/m2 |
4,100,000 |
|
||
|
3. Reinforced concrete framing, tiled or corrugated steel roof, plastered brick walls, ceramic tile floor. |
VND/m2 |
3,800,000 |
|
||
|
36 |
Bathrooms (separate unit) |
1. Reinforced concrete framing, reinforced concrete roof, enameled ceramic tile walls, ceramic tile floor. |
VND/m2 |
5,300,000 |
|
|
2. Reinforced concrete framing, tiled roof with plastic ceiling panel, enameled ceramic tile walls, ceramic tile floor. |
VND/m2 |
4,950,000 |
|
||
|
3. Reinforced concrete framing, corrugated steel or fibro roof with plastic ceiling panel, enameled ceramic tile walls, ceramic tile floor. |
VND/m2 |
4,600,000 |
|
||
|
4. Reinforced concrete framing, corrugated steel or fibro roof with plastic ceiling panel, brick masonry walls coated with water-based paint, ceramic tile floor. |
VND/m2 |
4,400,000 |
|
||
|
5. Reinforced concrete framing, corrugated steel or fibro roof with plastic ceiling panel, plastered brick walls, ceramic tile floor. |
VND/m2 |
4,250,000 |
|
||
|
6. Wooden pillars, corrugated steel roof, corrugated steel partitions, cement floor. |
VND/m2 |
1,000,000 |
|
||
|
37 |
Mezzanines |
1. Concrete mezzanine |
VND/m2 |
2,500,000 |
|
|
2. False concrete mezzanine |
VND/m2 |
1,500,000 |
|
||
|
3. Wooden plank mezzanine |
VND/m2 |
1,000,000 |
|
||
|
38 |
Canopies |
1. Brick pillars, steel rafters and beams, corrugated steel or fibro roof, cement concrete floor. |
VND/m2 |
1,300,000 |
|
|
2. Brick pillars, wooden rafters and beams, corrugated steel or fibro roof, cement concrete floor. |
VND/m2 |
1,200,000 |
|
||
|
3. Steel pipe pillars, metal rafters and beams; corrugated steel roof; clay brick floor. |
VND/m2 |
1,100,000 |
|
||
|
4. Wooden pillars, low-grade wood rafters and beams; corrugated steel roof; clay brick floor. |
VND/m2 |
660,000 |
|
||
|
5. Wooden pillars, low-grade rafters and beams; leaf roof; cement concrete floor. |
VND/m2 |
650,000 |
|
||
|
39 |
Swimming pools |
1. Built on rooftop terraces with awnings or inside of homes |
VND/m3 |
6,540,000 |
|
|
2. Built on terraces without awnings |
VND/m3 |
4,900,000 |
|
||
|
40 |
Fences |
1. Reinforced concrete framing; brick walls 20 cm thick; metal bars loaded onto fences; two-panel metal gate |
VND/m2 |
704,000 |
|
|
2. Reinforced concrete framing; brick walls 20 cm in thickness; metal bars loaded onto fences; two-panel metal gate |
VND/m2 |
536,000 |
|
||
|
3. Reinforced concrete posts; brick walls 10 cm thick and 0.24 m high; B40 wire mesh with metal frame loaded onto a fence. |
VND/m2 |
379,000 |
|
||
|
4. Reinforced concrete posts; brick walls 10 cm thick and 0.24 m high; B40 wire mesh with wooden frames loaded onto a fence. |
VND/m2 |
261,000 |
|
||
|
5. Reinforced concrete posts; brick walls 10 cm thick and 0.24 m high; barbed wire loaded onto a fence. |
VND/m2 |
150,000 |
|
||
|
41 |
Ceilings |
1. Plaster ceiling panel with recessed frame. |
VND/m2 |
140,000 |
|
|
2. Plaster ceiling panel with protruding frame |
VND/m2 |
154,000 |
|
||
|
3. Plywood ceiling panel. |
VND/m2 |
154,000 |
|
||
|
4. Wooden plank ceiling panel (made of natural wood, MDF wood). |
VND/m2 |
464,000 |
|
||
|
5. Plastic ceiling panel |
VND/m2 |
110,000 |
|
||
|
I |
Other riverside homes and architectural objects located within the city |
||||
|
42 |
Single-story townhouses |
1. Reinforced concrete frame, roof; brick masonry walls coated with water-based paint; reinforced concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
4,500,000 |
|
|
2. Reinforced concrete frame; tiled roof with ceiling panel, brick masonry walls coated with water-based paint; reinforced concrete or false concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
4,150,000 |
|
||
|
3. Reinforced concrete frame; tiled roof with ceiling panel, brick masonry walls coated with water-based paint; reinforced concrete and false concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
3,800,000 |
|
||
|
4. Brick posts; tiled roof; brick masonry walls coated with water-based paint; concrete sheet, false concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
3,150,000 |
|
||
|
5. Brick or wooden posts; corrugated steel, asphalt paper or leaf roof; brick + wooden plank or corrugated steel walls; concrete sheet or false concrete groundfloor (stilt floor above water level). |
VND/m2 |
2,300,000 |
|
||
|
6. Wooden posts; corrugated steel, asphalt paper or leaf roof; corrugated steel + wooden plank or leaf partitions; concrete sheet, false concrete or wooden plank stilt floor above water level paved with tiles. |
VND/m2 |
1,600,000 |
|
||
|
43 |
Multi-storey townhouses |
1. Reinforced concrete frame, floors, roof; brick masonry walls coated with water-based paint; reinforced concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
4,400,000 |
|
|
2. Reinforced concrete frame, floors; tiled or corrugated steel roof with ceiling panel; brick masonry walls coated with water-based paint; reinforced concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
4,050,000 |
|
||
|
3. Reinforced concrete or brick posts; floors loading onto class-I metal arch lintels; tiled or corrugated steel roof with ceiling panel; brick masonry walls coated with water-based paint; reinforced concrete groundfloor (stilt floor above water level) paved with tiles. |
VND/m2 |
3,650,000 |
|
||
|
4. Reinforced concrete or brick pillars, false concrete or wooden plank floors; false concrete, tiled or corrugated steel roof with ceiling panel; brick masonry walls; false concrete or concrete sheet groundfloor (stilt floor above water level). |
VND/m2 |
2,950,000 |
|
||
|
5. Wooden pillars, false concrete or wooden floors; false concrete, tiled or corrugated steel roof with ceiling panel; brick + wooden plank partitions; concrete sheet or wooden board groundfloor (stilt floor above water level). |
VND/m2 |
1,500,000 |
|
||
|
44 |
Multi-storey townhouses with groundfloors used as shared pathways or communal alleys |
1. Reinforced concrete posts, beams, roof; brick masonry walls coated with water-based paint; reinforced concrete floors paved with tiles. |
VND/m2 |
3,800,000 |
|
|
2. Reinforced concrete posts, beams; tiled roof with ceiling panel; brick masonry walls coated with water-based paint; reinforced concrete floors paved with tiles. |
VND/m2 |
3,450,000 |
|
||
|
3. Reinforced concrete posts, beams; tiled or corrugated steel roof with ceiling panel; brick masonry walls; false concrete floors paved with tiles. |
VND/m2 |
2,650,000 |
|
||
|
4. Brick pillars, metal or wooden posts; corrugated steel or tiled roof with ceiling panel; brick + wooden plank or corrugated steel walls; wooden board floors. |
VND/m2 |
1,350,000 |
|
||
Notes:
1. Investment unit cost of a construction work is measured in one square meter of floor area.
2. Investment unit costs of construction works quoted in the Schedule above are construction values including VAT of water supply and drainage, power supply systems, lightning resistant systems and firefighting water supply systems inside of these construction works.
They shall not include costs of construction equipment such as elevators; air refrigeration systems; communications, radio and television systems; pumping systems intended for firefighting and prevention activities, fire alarming systems; anti-burglary systems; cabinets, desks, chairs, stationery and office supplies and machinery intended for production, research, operation and healthcare purposes, etc.
3. Investment unit costs of urban technical infrastructure specified in the above-stated Schedule are construction values, inclusive of VAT, including costs of construction of infrastructure such as water drainage systems (water pipes, sewer manholes, pumping stations and water treatment stations); water supply systems (water supply pipelines, storage tanks and pumping stations); power systems (those serving lighting, domestic and industrial purposes, and voltage transformation stations), and costs incurred from other construction workloads such as ground backfilling, construction of internal roads, tree planting; do not include costs of construction of technical systems outside of urban areas.
4. If these costs are used for calculating registration fees for homes and construction works, regulations laid down in the Circular No. 124/2011/TT-BTC dated August 31, 2011 of the Ministry of Finance providing instructions on registration fees shall be applied.
5. Followings are cases in which unit costs of pile foundations L ≤ 15m or pile foundations L > 15m:
- If property owners hold documents evidencing that their construction works use pile foundations L > 15m, unit costs of pile foundations L > 15m shall be applied.
- If property owners do not hold documents evidencing that their construction works use pile foundations L > 15m, unit costs of pile foundations L ≤ 15m shall be applied.
6. If these unit costs are used for calculating compensation for losses, damage or site clearance upon the State’s land expropriation, regulations laid down in project compensation plans approved by state competent authorities shall be observed.
7. Apartment building and office buildings, including lower-storey or basement commercial halls (if any).
Investment unit costs of construction works with basements shall only be applied to the following cases: construction boundaries of basements are equivalent to those of construction works above ground; and total construction investment is calculated only on a basis of gross floor area, exclusive of basement floor area.
8. With respect to mixed-use buildings, construction values may be calculated by specific sections or uses./.
PEOPLE’S COMMITTEE OF HO CHI MINH CITY
------------------------------------------------------------------------------------------------------
This translation is made by THƯ VIỆN PHÁP LUẬT, Ho Chi Minh City, Vietnam and
for reference purposes only. Its copyright is owned by THƯ VIỆN PHÁP LUẬT
and protected under Clause 2, Article 14 of the Law on Intellectual Property.Your comments are always welcomed